Reference Number | SW013/10/2024 |
Title | Tender the Removal of One (1) 450-Ton Air Cooled Air Conditioning Chiller Unit and to Supply, Install and Commission One (1) Modern 450-Ton Capacity Air Cooled Chiller Unit at the San Fernando Teaching Hospital. |
Description | The South-West Regional Health Authority is desirous in seeking a Competent and Qualified Contractor or Supplier to undertake and carry out the project to Supply, Install and Commission One (1) Modern 450-Ton Capacity Air Cooled Chiller Screw type compressors (Mc Quay and Trane only) Units at San Fernando Teaching Hospital. The project entails the proper disconnection and removal of existing One 450 Ton Mc Quay air cooled chiller from the site earmarked for the new chillers and to supply, install, test and commission one (1) new chiller with required ancillaries to deliver a turnkey project with its operations and functions synchronized correctly with the existing HVAC and Building Management system at San Fernando Teaching Hospital (SFTH). Due to the critical nature of these equipment, reliability and efficiency is of utmost importance and as such, the Authority wishes to engage qualified, competent and reliable service providers to undertake this project |
Category | Heating, Ventilation, Air Conditioning & Refrigeration |
Contact Information | Secretary of the Tender Committee, Regional Administrative Centre 1, Paradise Pasture, Independence Avenue, San Fernando Tel: 225-1820, 225-1821 (direct lines). PBX: 225-4325 (Ext 2685, 2630, 2631, 2101) Email: contractsunit@swrha.co.tt eTender site: https://swrha.etenderworld.tt/login.php |
Publish Date | 21-10-2024 |
Expiry Date | 7-11-2024 |
Downloads |